Skip to content

Ghana news briefing

‘Bear with the system’ – Energy Ministry says temporary power control room to be ready by September

By GhanaSummary Newsroom1 min read
‘Bear with the system’ – Energy Ministry says temporary power control room to be ready by September

The Ministry of Energy has explained that the temporary control room being constructed to support power evacuation is expected to be completed by the end of September, despite an earlier timeline pointing to August.

His comments come after the Energy Minister announced that the temporary control room is expected to be ready by the end of September, while an investigative committee had earlier indicated that an interim system would be operational by the end of August.

Mr Rockson said the temporary arrangement had allowed the country to continue evacuating power while the control room is being constructed.

ShareXFacebookWhatsApp

This is a summary of the original articles listed below. Always read the source articles for the full context. GhanaSummary does not create or modify the news — we summarise and link to original publishers.

Original sources

1 reports

More stories

View all news