Ghana news briefing
Task force begins demolition, dredging exercise in Accra

In an interview, the Coordinator of the Flood Mitigation Task Force, Brigadier General Forster Okae-Yeboah, explained that illegal developments had severely restricted the natural flow of water.
Dredging and Restoration Following the demolition of unauthorised structures, the task force immediately began dredging the Tesa Dam, removing heavy silt deposits to restore the dam's storage capacity and improve the free flow of water.
Tesa Dam Operation At the Tesa Dam, located adjacent to Boundary Road in East Legon, the task force demolished structures built along the banks of the reservoir, which serves as a critical flood retention basin designed to temporarily store stormwater during heavy rains before releasing it gradually into the drainage network.
This is a summary of the original articles listed below. Always read the source articles for the full context. GhanaSummary does not create or modify the news — we summarise and link to original publishers.


