Ghana news briefing
GARID project delaying rehabilitation of Kaneshie footbridges – AMA Mayor

Speaking on Channel One TV on Monday, August 3, Mr Allotey said the Assembly was deliberately waiting for the drainage project to be completed before commencing work on the footbridges to avoid unnecessary expenditure.
He said the GARID project will require the temporary closure of one section of the road to facilitate drainage works, with traffic from Mallam towards Kaneshie expected to use the opposite carriageway during the construction period.
According to the Mayor, the footbridges form part of a wider corridor affected by the GARID drainage project, making it impractical for the Accra Metropolitan Assembly (AMA) to undertake repairs while major construction activities are still underway.
This is a summary of the original articles listed below. Always read the source articles for the full context. GhanaSummary does not create or modify the news — we summarise and link to original publishers.
Original sources
1 reportsMore stories
View all news
I don’t need a Thank-You Tour to sell myself – Asiedu Nketiah rejects presidential agenda claims

You cannot hide your ambition and expect people to vote for you – Asiedu Nketiah’s 2028 Message

I won’t declare NDC Chairmanship re-election bid before internal elections – Asiedu Nketia

I have never ruled any position out – Asiedu Nketiah keeps presidential ambition alive

I will not rule out running for President – Asiedu Nketiah

Ghana needs cut-off period for political campaigning — Asiedu Nketia
Don’t stop here