Skip to content

Ghana news briefing

IES demands stronger safeguards amid temporary Akosombo power arrangement

By GhanaSummary Newsroom1 min read
IES demands stronger safeguards amid temporary Akosombo power arrangement

READ ALSO: GRIDCo identifies Akosombo–Volta line fault as cause of widespread power outage Energy and Green Transition Minister John Jinapor explained that the latest disruption was linked to a temporary arrangement introduced after an earlier incident severely affected the Akosombo transmission infrastructure.

Senior Research and Policy Analyst at IES, Derrick Xatse, said while a permanent solution to the challenges affecting the Akosombo transmission infrastructure is necessary, the interim arrangement must also be resilient enough to withstand disruptions and facilitate the quick restoration of power.

According to Dr Jinapor, government had two options: shut down the Akosombo plant for about six months to completely rebuild the control centre or introduce a temporary system that would allow the plant to continue supplying power while permanent works were undertaken.

ShareXFacebookWhatsApp

This is a summary of the original articles listed below. Always read the source articles for the full context. GhanaSummary does not create or modify the news — we summarise and link to original publishers.

Original sources

1 reports

More stories

View all news