
IMC to scale down operations at Musina repatriation centre
The Inter-Ministerial Committee (IMC) on Migration will be scaling down operations at the repatriation centre in Musina, in Limpopo from 20 000 capacity to 1 500 after analysis of data trends for the past three weeks showed a reduction in numbers of those processed.
The Border Management Authority (BMA) has processed at all its ports of entry 72 906 repatriations for the period 7 June until 14 July 2026 for various nationalities, inclusive of what has been processed at the TRPC.
She broke down the numbers of those sent to their home countries since last month, Mamaloko says 68 138 foreign nationals have been processed.
This is a summary of the original articles listed below. Always read the source articles for the full context. GhanaSummary does not create or modify the news — we summarise and link to original publishers.


