
1st Niger Bridge closure begins as commuters lament Owerri Road
Meanwhile, the Federal Road Safety Corps (FRSC), Anambra State Command, deployed personnel to strategic locations around the Onitsha end of the bridge to manage traffic during the maintenance period.
By Chimaobi Nwaiwu NNEWI — The temporary closure of the 1st Niger Bridge to traffic for emergency maintenance commenced on Monday, with motorists diverted to the 2nd Niger Bridge.
The FRSC had also conducted a road audit of major routes connecting the 2nd Niger Bridge ahead of the closure.
This is a summary of the original articles listed below. Always read the source articles for the full context. GhanaSummary does not create or modify the news — we summarise and link to original publishers.


