The country's power installations within the Aboadze enclave in the Western Region risk being wiped away by tidal waves, despite the ongoing construction of a sea defence wall.
The two-kilometre sea defence wall being constructed leaves a 550-metres gap that is exposing the Twin City and the Aboadze Thermal plants, to that risk of destruction.
The gap was reserved for another thermal plant, but, the idea did not materialise.
The Chief Executive Officer of the Ghana Hydrological Authority, Dr John Kissi, has, therefore called for immediate action to close the gap as sea erosion and tidal waves continue to ravage the area.