Residents in the Ashanti Region are calling on the government to urgently intervene in the reconstruction of the Denchembuoso-Techiman road, which has deteriorated into an unusable and hazardous route over the years.
The road, which connects several communities including Trabuom, Ofoase, Atwima Boko, and Twedie, was upgraded in 2019 as part of a 16.2-kilometer Kwadaso-Trabuom project awarded to Asabea Engineering Limited.
It was expected to be completed within two years but has since been abandoned, causing major disruptions in transport, commerce, and daily life.
Speaking to Citi News, some residents expressed frustration with the dust pollution during the dry season and the muddy, pothole-ridden conditions when it rains.